{"id":12767,"date":"2015-07-02T09:12:42","date_gmt":"2015-07-02T07:12:42","guid":{"rendered":"https:\/\/www.groningen-seaports.com\/nieuws\/first-monopile-for-the-gemini-wind-park-successfully-installed\/"},"modified":"2026-05-28T11:48:26","modified_gmt":"2026-05-28T09:48:26","slug":"first-monopile-for-the-gemini-wind-park-successfully-installed","status":"publish","type":"post","link":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/first-monopile-for-the-gemini-wind-park-successfully-installed\/","title":{"rendered":"First monopile for the Gemini wind park successfully installed"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><em>Important milestone reached in the construction of one of the world\u2019s largest wind parks<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The first monopile at the Gemini wind park has been successfully installed. The wind park will consist of 150 Siemens wind turbines in total, and is owned by Northland Power (60%), Siemens (20%), Van Oord (10%) and HVC (10%).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Gemini will be built in the North Sea, and the building process is taking place over a three year period. The park encompasses two 34 square kilometer areas and is located 85 kilometers off the coast of Groningen. Invisible from the coast, the wind park will generate energy in the part of the North Sea where wind speeds are among the highest and most constant in the world.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The monopiles are being placed by the main contractor Van Oord with their own offshore installation vessel the Aeolus, and a second hired vessel, the Pacific Osprey of Swire Blue Ocean. Each steel monopile is designed for its specific location in the wind park. Depending on sea depth, they vary in length from 59 to 73 meters. The monopiles have a diameter of 7 meters, and a wall thickness of 7 to 11 centimeters.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThe installation of the first monopile is a special moment for everyone involved in the project,\u201d says Matthias Haag, CEO of Gemini. \u201cThe installation constitutes a milestone in the construction phase and has been realized as planned through close collaboration with our project partners.\u201d During the three-year construction period, an estimated 500 people will work on the project. The park is expected to be fully operational by 2017. Once operational Gemini will generate clean and renewable energy for 1.5 million people in the Netherlands.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Gemini will be significantly contributing to the Netherlands and the European Union reaching their goals regarding sustainable energy. Through Gemini\u2019s contribution, the Dutch CO2 emissions are expected to be reduced by 1.25 million tons per year. Gemini will therefore play an important role in the worldwide transition towards a sustainable future.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>About Gemini<\/strong><br>With a total capacity of 600 megawatts, Gemini is set to be one of the world\u2019s largest offshore wind parks in the Dutch North Sea, both in size and in production. Four project partners have joined forces to make Gemini a reality: Canadian independent renewable energy company Northland Power (60% project interest), wind turbine manufacturer Siemens (20%), Dutch maritime contractor Van Oord (10%) and renewable energy, waste and raw materials company HVC(10%).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><figure id=\"attachment_3111\" aria-describedby=\"caption-attachment-3111\" style=\"width: 1024px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-3111\" src=\"https:\/\/www.groningen-seaports.com\/wp-content\/uploads\/Installatie-monopile-door-Aeolus-Van-Oord-kl-2.jpg\" alt=\"Installation monopile by Aeolus Van Oord\" width=\"1024\" height=\"768\" \/><figcaption id=\"caption-attachment-3111\" class=\"wp-caption-text\">Installation monopile by Aeolus Van Oord<\/figcaption><\/figure><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Important milestone reached in the construction of one of the world\u2019s largest wind parks The first monopile at the Gemini wind park has been successfully installed. The wind park will consist of 150 Siemens wind turbines in total, and is owned by Northland Power (60%), Siemens (20%), Van Oord (10%) and HVC (10%). Gemini will&#8230;<\/p>\n","protected":false},"author":3,"featured_media":2130,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_kad_blocks_custom_css":"","_kad_blocks_head_custom_js":"","_kad_blocks_body_custom_js":"","_kad_blocks_footer_custom_js":"","_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"_kad_post_classname":"","footnotes":""},"categories":[52],"tags":[],"class_list":["post-12767","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-offshore-wind"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>First monopile for the Gemini wind park successfully installed - Groningen Seaports - Havenbeheer Delfzijl en Eemshaven<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.groningen-seaports.com\/en\/nieuws\/first-monopile-for-the-gemini-wind-park-successfully-installed\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"First monopile for the Gemini wind park successfully installed - Groningen Seaports - Havenbeheer Delfzijl en Eemshaven\" \/>\n<meta property=\"og:description\" content=\"Important milestone reached in the construction of one of the world\u2019s largest wind parks The first monopile at the Gemini wind park has been successfully installed. The wind park will consist of 150 Siemens wind turbines in total, and is owned by Northland Power (60%), Siemens (20%), Van Oord (10%) and HVC (10%). Gemini will...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.groningen-seaports.com\/en\/nieuws\/first-monopile-for-the-gemini-wind-park-successfully-installed\/\" \/>\n<meta property=\"og:site_name\" content=\"Groningen Seaports - Havenbeheer Delfzijl en Eemshaven\" \/>\n<meta property=\"article:published_time\" content=\"2015-07-02T07:12:42+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-28T09:48:26+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.groningen-seaports.com\/wp-content\/uploads\/Installatie-monopile-door-Aeolus-Van-Oord-kl-2.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Martijn Pilon\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Martijn Pilon\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/en\\\/nieuws\\\/first-monopile-for-the-gemini-wind-park-successfully-installed\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/en\\\/nieuws\\\/first-monopile-for-the-gemini-wind-park-successfully-installed\\\/\"},\"author\":{\"name\":\"Martijn Pilon\",\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/#\\\/schema\\\/person\\\/8846c10c2b1673a9224208cb70f04ff4\"},\"headline\":\"First monopile for the Gemini wind park successfully installed\",\"datePublished\":\"2015-07-02T07:12:42+00:00\",\"dateModified\":\"2026-05-28T09:48:26+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/en\\\/nieuws\\\/first-monopile-for-the-gemini-wind-park-successfully-installed\\\/\"},\"wordCount\":409,\"publisher\":{\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/en\\\/nieuws\\\/first-monopile-for-the-gemini-wind-park-successfully-installed\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.groningen-seaports.com\\\/wp-content\\\/uploads\\\/Installatie-monopile-door-Aeolus-Van-Oord-kl-2.jpg\",\"articleSection\":[\"OFFSHORE WIND\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/en\\\/nieuws\\\/first-monopile-for-the-gemini-wind-park-successfully-installed\\\/\",\"url\":\"https:\\\/\\\/www.groningen-seaports.com\\\/en\\\/nieuws\\\/first-monopile-for-the-gemini-wind-park-successfully-installed\\\/\",\"name\":\"First monopile for the Gemini wind park successfully installed - Groningen Seaports - Havenbeheer Delfzijl en Eemshaven\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/en\\\/nieuws\\\/first-monopile-for-the-gemini-wind-park-successfully-installed\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/en\\\/nieuws\\\/first-monopile-for-the-gemini-wind-park-successfully-installed\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.groningen-seaports.com\\\/wp-content\\\/uploads\\\/Installatie-monopile-door-Aeolus-Van-Oord-kl-2.jpg\",\"datePublished\":\"2015-07-02T07:12:42+00:00\",\"dateModified\":\"2026-05-28T09:48:26+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/en\\\/nieuws\\\/first-monopile-for-the-gemini-wind-park-successfully-installed\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.groningen-seaports.com\\\/en\\\/nieuws\\\/first-monopile-for-the-gemini-wind-park-successfully-installed\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/en\\\/nieuws\\\/first-monopile-for-the-gemini-wind-park-successfully-installed\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.groningen-seaports.com\\\/wp-content\\\/uploads\\\/Installatie-monopile-door-Aeolus-Van-Oord-kl-2.jpg\",\"contentUrl\":\"https:\\\/\\\/www.groningen-seaports.com\\\/wp-content\\\/uploads\\\/Installatie-monopile-door-Aeolus-Van-Oord-kl-2.jpg\",\"width\":1024,\"height\":768},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/en\\\/nieuws\\\/first-monopile-for-the-gemini-wind-park-successfully-installed\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.groningen-seaports.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"First monopile for the Gemini wind park successfully installed\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/#website\",\"url\":\"https:\\\/\\\/www.groningen-seaports.com\\\/\",\"name\":\"Groningen Seaports - Havenbeheer Delfzijl en Eemshaven\",\"description\":\"Groningen Seaports - Havenbeheer Delfzijl en Eemshaven\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.groningen-seaports.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/#organization\",\"name\":\"Groningen Seaports - Havenbeheer Delfzijl en Eemshaven\",\"url\":\"https:\\\/\\\/www.groningen-seaports.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.groningen-seaports.com\\\/wp-content\\\/uploads\\\/GS2-01.svg\",\"contentUrl\":\"https:\\\/\\\/www.groningen-seaports.com\\\/wp-content\\\/uploads\\\/GS2-01.svg\",\"width\":170,\"height\":63,\"caption\":\"Groningen Seaports - Havenbeheer Delfzijl en Eemshaven\"},\"image\":{\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/#\\\/schema\\\/person\\\/8846c10c2b1673a9224208cb70f04ff4\",\"name\":\"Martijn Pilon\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3c960423a8cf03318cf3c537afcd2c9d854e4ce7dc6dae4c2d4cd9c09b5e9d5f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3c960423a8cf03318cf3c537afcd2c9d854e4ce7dc6dae4c2d4cd9c09b5e9d5f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3c960423a8cf03318cf3c537afcd2c9d854e4ce7dc6dae4c2d4cd9c09b5e9d5f?s=96&d=mm&r=g\",\"caption\":\"Martijn Pilon\"},\"url\":\"https:\\\/\\\/www.groningen-seaports.com\\\/en\\\/nieuws\\\/author\\\/gsp_martijn\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"First monopile for the Gemini wind park successfully installed - Groningen Seaports - Havenbeheer Delfzijl en Eemshaven","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/first-monopile-for-the-gemini-wind-park-successfully-installed\/","og_locale":"en_US","og_type":"article","og_title":"First monopile for the Gemini wind park successfully installed - Groningen Seaports - Havenbeheer Delfzijl en Eemshaven","og_description":"Important milestone reached in the construction of one of the world\u2019s largest wind parks The first monopile at the Gemini wind park has been successfully installed. The wind park will consist of 150 Siemens wind turbines in total, and is owned by Northland Power (60%), Siemens (20%), Van Oord (10%) and HVC (10%). Gemini will...","og_url":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/first-monopile-for-the-gemini-wind-park-successfully-installed\/","og_site_name":"Groningen Seaports - Havenbeheer Delfzijl en Eemshaven","article_published_time":"2015-07-02T07:12:42+00:00","article_modified_time":"2026-05-28T09:48:26+00:00","og_image":[{"width":1024,"height":768,"url":"https:\/\/www.groningen-seaports.com\/wp-content\/uploads\/Installatie-monopile-door-Aeolus-Van-Oord-kl-2.jpg","type":"image\/jpeg"}],"author":"Martijn Pilon","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Martijn Pilon","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/first-monopile-for-the-gemini-wind-park-successfully-installed\/#article","isPartOf":{"@id":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/first-monopile-for-the-gemini-wind-park-successfully-installed\/"},"author":{"name":"Martijn Pilon","@id":"https:\/\/www.groningen-seaports.com\/#\/schema\/person\/8846c10c2b1673a9224208cb70f04ff4"},"headline":"First monopile for the Gemini wind park successfully installed","datePublished":"2015-07-02T07:12:42+00:00","dateModified":"2026-05-28T09:48:26+00:00","mainEntityOfPage":{"@id":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/first-monopile-for-the-gemini-wind-park-successfully-installed\/"},"wordCount":409,"publisher":{"@id":"https:\/\/www.groningen-seaports.com\/#organization"},"image":{"@id":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/first-monopile-for-the-gemini-wind-park-successfully-installed\/#primaryimage"},"thumbnailUrl":"https:\/\/www.groningen-seaports.com\/wp-content\/uploads\/Installatie-monopile-door-Aeolus-Van-Oord-kl-2.jpg","articleSection":["OFFSHORE WIND"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/first-monopile-for-the-gemini-wind-park-successfully-installed\/","url":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/first-monopile-for-the-gemini-wind-park-successfully-installed\/","name":"First monopile for the Gemini wind park successfully installed - Groningen Seaports - Havenbeheer Delfzijl en Eemshaven","isPartOf":{"@id":"https:\/\/www.groningen-seaports.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/first-monopile-for-the-gemini-wind-park-successfully-installed\/#primaryimage"},"image":{"@id":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/first-monopile-for-the-gemini-wind-park-successfully-installed\/#primaryimage"},"thumbnailUrl":"https:\/\/www.groningen-seaports.com\/wp-content\/uploads\/Installatie-monopile-door-Aeolus-Van-Oord-kl-2.jpg","datePublished":"2015-07-02T07:12:42+00:00","dateModified":"2026-05-28T09:48:26+00:00","breadcrumb":{"@id":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/first-monopile-for-the-gemini-wind-park-successfully-installed\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.groningen-seaports.com\/en\/nieuws\/first-monopile-for-the-gemini-wind-park-successfully-installed\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/first-monopile-for-the-gemini-wind-park-successfully-installed\/#primaryimage","url":"https:\/\/www.groningen-seaports.com\/wp-content\/uploads\/Installatie-monopile-door-Aeolus-Van-Oord-kl-2.jpg","contentUrl":"https:\/\/www.groningen-seaports.com\/wp-content\/uploads\/Installatie-monopile-door-Aeolus-Van-Oord-kl-2.jpg","width":1024,"height":768},{"@type":"BreadcrumbList","@id":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/first-monopile-for-the-gemini-wind-park-successfully-installed\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.groningen-seaports.com\/en\/"},{"@type":"ListItem","position":2,"name":"First monopile for the Gemini wind park successfully installed"}]},{"@type":"WebSite","@id":"https:\/\/www.groningen-seaports.com\/#website","url":"https:\/\/www.groningen-seaports.com\/","name":"Groningen Seaports - Havenbeheer Delfzijl en Eemshaven","description":"Groningen Seaports - Havenbeheer Delfzijl en Eemshaven","publisher":{"@id":"https:\/\/www.groningen-seaports.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.groningen-seaports.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.groningen-seaports.com\/#organization","name":"Groningen Seaports - Havenbeheer Delfzijl en Eemshaven","url":"https:\/\/www.groningen-seaports.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.groningen-seaports.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.groningen-seaports.com\/wp-content\/uploads\/GS2-01.svg","contentUrl":"https:\/\/www.groningen-seaports.com\/wp-content\/uploads\/GS2-01.svg","width":170,"height":63,"caption":"Groningen Seaports - Havenbeheer Delfzijl en Eemshaven"},"image":{"@id":"https:\/\/www.groningen-seaports.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.groningen-seaports.com\/#\/schema\/person\/8846c10c2b1673a9224208cb70f04ff4","name":"Martijn Pilon","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/3c960423a8cf03318cf3c537afcd2c9d854e4ce7dc6dae4c2d4cd9c09b5e9d5f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/3c960423a8cf03318cf3c537afcd2c9d854e4ce7dc6dae4c2d4cd9c09b5e9d5f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/3c960423a8cf03318cf3c537afcd2c9d854e4ce7dc6dae4c2d4cd9c09b5e9d5f?s=96&d=mm&r=g","caption":"Martijn Pilon"},"url":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/author\/gsp_martijn\/"}]}},"taxonomy_info":{"category":[{"value":52,"label":"OFFSHORE WIND"}]},"featured_image_src_large":["https:\/\/www.groningen-seaports.com\/wp-content\/uploads\/Installatie-monopile-door-Aeolus-Van-Oord-kl-2.jpg",1024,768,false],"author_info":{"display_name":"Martijn Pilon","author_link":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/author\/gsp_martijn\/"},"comment_info":"","category_info":[{"term_id":52,"name":"OFFSHORE WIND","slug":"offshore-wind","term_group":0,"term_taxonomy_id":52,"taxonomy":"category","description":"","parent":0,"count":44,"filter":"raw","cat_ID":52,"category_count":44,"category_description":"","cat_name":"OFFSHORE WIND","category_nicename":"offshore-wind","category_parent":0}],"tag_info":false,"_links":{"self":[{"href":"https:\/\/www.groningen-seaports.com\/en\/wp-json\/wp\/v2\/posts\/12767","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.groningen-seaports.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.groningen-seaports.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.groningen-seaports.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.groningen-seaports.com\/en\/wp-json\/wp\/v2\/comments?post=12767"}],"version-history":[{"count":1,"href":"https:\/\/www.groningen-seaports.com\/en\/wp-json\/wp\/v2\/posts\/12767\/revisions"}],"predecessor-version":[{"id":12768,"href":"https:\/\/www.groningen-seaports.com\/en\/wp-json\/wp\/v2\/posts\/12767\/revisions\/12768"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.groningen-seaports.com\/en\/wp-json\/wp\/v2\/media\/2130"}],"wp:attachment":[{"href":"https:\/\/www.groningen-seaports.com\/en\/wp-json\/wp\/v2\/media?parent=12767"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.groningen-seaports.com\/en\/wp-json\/wp\/v2\/categories?post=12767"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.groningen-seaports.com\/en\/wp-json\/wp\/v2\/tags?post=12767"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}