{"id":12821,"date":"2018-02-20T10:16:01","date_gmt":"2018-02-20T09:16:01","guid":{"rendered":"https:\/\/www.groningen-seaports.com\/nieuws\/placement-merkur-offshore-wind-turbines-underway\/"},"modified":"2026-05-28T11:50:07","modified_gmt":"2026-05-28T09:50:07","slug":"placement-merkur-offshore-wind-turbines-underway","status":"publish","type":"post","link":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/placement-merkur-offshore-wind-turbines-underway\/","title":{"rendered":"Placement of Merkur Offshore wind turbines underway"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><em>Installation vessel Seafox 5 in Eemshaven for the first time<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The construction of the Merkur Offshore wind farm is moving on to the next phase. Installation vessel Sea Challenger has now placed most of the transition pieces. These are the pieces between the foundation pile and the tower sections of the wind turbines. This means that the project has entered a new phase: the placement of the wind turbines themselves.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The next step is the installation of the tower sections of the wind turbines, the gondolas and the rotor blades. The installation vessel Seafox 5, which was built in 2012, will be taking care of this work and arrived at Eemshaven for that purpose last week. This is the first time that the Seafox 5 has put into Eemshaven, which means that this imposing jack-up ship can now be added to the already long list of vessels that moored earlier in Eemshaven.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Seafox 5 has a length of 115.21 metres and a width of 49.98 metres, with a draught of 9.5 metres. The installation vessel sails under the English flag and is carrying out this project for Geo Sea. Seafox 5 positioned itself on its four legs at the Orange Blue Terminals quay in Julianahaven to hoist the wind turbine components on board.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The jack-up installation vessel Seafox 5 will be installing all 66 GE Renewable Energy Haliade wind turbines for the Merkur wind farm. This is expected to take a good six months. Wind farm Merkur Offshore will have a capacity of 400 MW after commissioning.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-4815\" src=\"https:\/\/www.groningen-seaports.com\/wp-content\/uploads\/IMG_4313_kl.jpg\" alt=\"\" width=\"1024\" height=\"768\" \/><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Installation vessel Seafox 5 at Orange Blue Terminals in Julianahaven, Eemshaven<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Installation vessel Seafox 5 in Eemshaven for the first time The construction of the Merkur Offshore wind farm is moving on to the next phase. Installation vessel Sea Challenger has now placed most of the transition pieces. These are the pieces between the foundation pile and the tower sections of the wind turbines. This means&#8230;<\/p>\n","protected":false},"author":3,"featured_media":2447,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_kad_blocks_custom_css":"","_kad_blocks_head_custom_js":"","_kad_blocks_body_custom_js":"","_kad_blocks_footer_custom_js":"","_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"_kad_post_classname":"","footnotes":""},"categories":[52],"tags":[],"class_list":["post-12821","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-offshore-wind"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Placement of Merkur Offshore wind turbines underway - Groningen Seaports - Havenbeheer Delfzijl en Eemshaven<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.groningen-seaports.com\/en\/nieuws\/placement-merkur-offshore-wind-turbines-underway\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Placement of Merkur Offshore wind turbines underway - Groningen Seaports - Havenbeheer Delfzijl en Eemshaven\" \/>\n<meta property=\"og:description\" content=\"Installation vessel Seafox 5 in Eemshaven for the first time The construction of the Merkur Offshore wind farm is moving on to the next phase. Installation vessel Sea Challenger has now placed most of the transition pieces. These are the pieces between the foundation pile and the tower sections of the wind turbines. This means...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.groningen-seaports.com\/en\/nieuws\/placement-merkur-offshore-wind-turbines-underway\/\" \/>\n<meta property=\"og:site_name\" content=\"Groningen Seaports - Havenbeheer Delfzijl en Eemshaven\" \/>\n<meta property=\"article:published_time\" content=\"2018-02-20T09:16:01+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-28T09:50:07+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.groningen-seaports.com\/wp-content\/uploads\/IMG_4313_kl-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Martijn Pilon\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Martijn Pilon\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/en\\\/nieuws\\\/placement-merkur-offshore-wind-turbines-underway\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/en\\\/nieuws\\\/placement-merkur-offshore-wind-turbines-underway\\\/\"},\"author\":{\"name\":\"Martijn Pilon\",\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/#\\\/schema\\\/person\\\/8846c10c2b1673a9224208cb70f04ff4\"},\"headline\":\"Placement of Merkur Offshore wind turbines underway\",\"datePublished\":\"2018-02-20T09:16:01+00:00\",\"dateModified\":\"2026-05-28T09:50:07+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/en\\\/nieuws\\\/placement-merkur-offshore-wind-turbines-underway\\\/\"},\"wordCount\":263,\"publisher\":{\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/en\\\/nieuws\\\/placement-merkur-offshore-wind-turbines-underway\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.groningen-seaports.com\\\/wp-content\\\/uploads\\\/IMG_4313_kl-1.jpg\",\"articleSection\":[\"OFFSHORE WIND\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/en\\\/nieuws\\\/placement-merkur-offshore-wind-turbines-underway\\\/\",\"url\":\"https:\\\/\\\/www.groningen-seaports.com\\\/en\\\/nieuws\\\/placement-merkur-offshore-wind-turbines-underway\\\/\",\"name\":\"Placement of Merkur Offshore wind turbines underway - Groningen Seaports - Havenbeheer Delfzijl en Eemshaven\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/en\\\/nieuws\\\/placement-merkur-offshore-wind-turbines-underway\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/en\\\/nieuws\\\/placement-merkur-offshore-wind-turbines-underway\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.groningen-seaports.com\\\/wp-content\\\/uploads\\\/IMG_4313_kl-1.jpg\",\"datePublished\":\"2018-02-20T09:16:01+00:00\",\"dateModified\":\"2026-05-28T09:50:07+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/en\\\/nieuws\\\/placement-merkur-offshore-wind-turbines-underway\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.groningen-seaports.com\\\/en\\\/nieuws\\\/placement-merkur-offshore-wind-turbines-underway\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/en\\\/nieuws\\\/placement-merkur-offshore-wind-turbines-underway\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.groningen-seaports.com\\\/wp-content\\\/uploads\\\/IMG_4313_kl-1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.groningen-seaports.com\\\/wp-content\\\/uploads\\\/IMG_4313_kl-1.jpg\",\"width\":1024,\"height\":768},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/en\\\/nieuws\\\/placement-merkur-offshore-wind-turbines-underway\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.groningen-seaports.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Placement of Merkur Offshore wind turbines underway\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/#website\",\"url\":\"https:\\\/\\\/www.groningen-seaports.com\\\/\",\"name\":\"Groningen Seaports - Havenbeheer Delfzijl en Eemshaven\",\"description\":\"Groningen Seaports - Havenbeheer Delfzijl en Eemshaven\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.groningen-seaports.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/#organization\",\"name\":\"Groningen Seaports - Havenbeheer Delfzijl en Eemshaven\",\"url\":\"https:\\\/\\\/www.groningen-seaports.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.groningen-seaports.com\\\/wp-content\\\/uploads\\\/GS2-01.svg\",\"contentUrl\":\"https:\\\/\\\/www.groningen-seaports.com\\\/wp-content\\\/uploads\\\/GS2-01.svg\",\"width\":170,\"height\":63,\"caption\":\"Groningen Seaports - Havenbeheer Delfzijl en Eemshaven\"},\"image\":{\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.groningen-seaports.com\\\/#\\\/schema\\\/person\\\/8846c10c2b1673a9224208cb70f04ff4\",\"name\":\"Martijn Pilon\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3c960423a8cf03318cf3c537afcd2c9d854e4ce7dc6dae4c2d4cd9c09b5e9d5f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3c960423a8cf03318cf3c537afcd2c9d854e4ce7dc6dae4c2d4cd9c09b5e9d5f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3c960423a8cf03318cf3c537afcd2c9d854e4ce7dc6dae4c2d4cd9c09b5e9d5f?s=96&d=mm&r=g\",\"caption\":\"Martijn Pilon\"},\"url\":\"https:\\\/\\\/www.groningen-seaports.com\\\/en\\\/nieuws\\\/author\\\/gsp_martijn\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Placement of Merkur Offshore wind turbines underway - Groningen Seaports - Havenbeheer Delfzijl en Eemshaven","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/placement-merkur-offshore-wind-turbines-underway\/","og_locale":"en_US","og_type":"article","og_title":"Placement of Merkur Offshore wind turbines underway - Groningen Seaports - Havenbeheer Delfzijl en Eemshaven","og_description":"Installation vessel Seafox 5 in Eemshaven for the first time The construction of the Merkur Offshore wind farm is moving on to the next phase. Installation vessel Sea Challenger has now placed most of the transition pieces. These are the pieces between the foundation pile and the tower sections of the wind turbines. This means...","og_url":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/placement-merkur-offshore-wind-turbines-underway\/","og_site_name":"Groningen Seaports - Havenbeheer Delfzijl en Eemshaven","article_published_time":"2018-02-20T09:16:01+00:00","article_modified_time":"2026-05-28T09:50:07+00:00","og_image":[{"width":1024,"height":768,"url":"https:\/\/www.groningen-seaports.com\/wp-content\/uploads\/IMG_4313_kl-1.jpg","type":"image\/jpeg"}],"author":"Martijn Pilon","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Martijn Pilon","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/placement-merkur-offshore-wind-turbines-underway\/#article","isPartOf":{"@id":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/placement-merkur-offshore-wind-turbines-underway\/"},"author":{"name":"Martijn Pilon","@id":"https:\/\/www.groningen-seaports.com\/#\/schema\/person\/8846c10c2b1673a9224208cb70f04ff4"},"headline":"Placement of Merkur Offshore wind turbines underway","datePublished":"2018-02-20T09:16:01+00:00","dateModified":"2026-05-28T09:50:07+00:00","mainEntityOfPage":{"@id":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/placement-merkur-offshore-wind-turbines-underway\/"},"wordCount":263,"publisher":{"@id":"https:\/\/www.groningen-seaports.com\/#organization"},"image":{"@id":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/placement-merkur-offshore-wind-turbines-underway\/#primaryimage"},"thumbnailUrl":"https:\/\/www.groningen-seaports.com\/wp-content\/uploads\/IMG_4313_kl-1.jpg","articleSection":["OFFSHORE WIND"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/placement-merkur-offshore-wind-turbines-underway\/","url":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/placement-merkur-offshore-wind-turbines-underway\/","name":"Placement of Merkur Offshore wind turbines underway - Groningen Seaports - Havenbeheer Delfzijl en Eemshaven","isPartOf":{"@id":"https:\/\/www.groningen-seaports.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/placement-merkur-offshore-wind-turbines-underway\/#primaryimage"},"image":{"@id":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/placement-merkur-offshore-wind-turbines-underway\/#primaryimage"},"thumbnailUrl":"https:\/\/www.groningen-seaports.com\/wp-content\/uploads\/IMG_4313_kl-1.jpg","datePublished":"2018-02-20T09:16:01+00:00","dateModified":"2026-05-28T09:50:07+00:00","breadcrumb":{"@id":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/placement-merkur-offshore-wind-turbines-underway\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.groningen-seaports.com\/en\/nieuws\/placement-merkur-offshore-wind-turbines-underway\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/placement-merkur-offshore-wind-turbines-underway\/#primaryimage","url":"https:\/\/www.groningen-seaports.com\/wp-content\/uploads\/IMG_4313_kl-1.jpg","contentUrl":"https:\/\/www.groningen-seaports.com\/wp-content\/uploads\/IMG_4313_kl-1.jpg","width":1024,"height":768},{"@type":"BreadcrumbList","@id":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/placement-merkur-offshore-wind-turbines-underway\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.groningen-seaports.com\/en\/"},{"@type":"ListItem","position":2,"name":"Placement of Merkur Offshore wind turbines underway"}]},{"@type":"WebSite","@id":"https:\/\/www.groningen-seaports.com\/#website","url":"https:\/\/www.groningen-seaports.com\/","name":"Groningen Seaports - Havenbeheer Delfzijl en Eemshaven","description":"Groningen Seaports - Havenbeheer Delfzijl en Eemshaven","publisher":{"@id":"https:\/\/www.groningen-seaports.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.groningen-seaports.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.groningen-seaports.com\/#organization","name":"Groningen Seaports - Havenbeheer Delfzijl en Eemshaven","url":"https:\/\/www.groningen-seaports.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.groningen-seaports.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.groningen-seaports.com\/wp-content\/uploads\/GS2-01.svg","contentUrl":"https:\/\/www.groningen-seaports.com\/wp-content\/uploads\/GS2-01.svg","width":170,"height":63,"caption":"Groningen Seaports - Havenbeheer Delfzijl en Eemshaven"},"image":{"@id":"https:\/\/www.groningen-seaports.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.groningen-seaports.com\/#\/schema\/person\/8846c10c2b1673a9224208cb70f04ff4","name":"Martijn Pilon","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/3c960423a8cf03318cf3c537afcd2c9d854e4ce7dc6dae4c2d4cd9c09b5e9d5f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/3c960423a8cf03318cf3c537afcd2c9d854e4ce7dc6dae4c2d4cd9c09b5e9d5f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/3c960423a8cf03318cf3c537afcd2c9d854e4ce7dc6dae4c2d4cd9c09b5e9d5f?s=96&d=mm&r=g","caption":"Martijn Pilon"},"url":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/author\/gsp_martijn\/"}]}},"taxonomy_info":{"category":[{"value":52,"label":"OFFSHORE WIND"}]},"featured_image_src_large":["https:\/\/www.groningen-seaports.com\/wp-content\/uploads\/IMG_4313_kl-1.jpg",1024,768,false],"author_info":{"display_name":"Martijn Pilon","author_link":"https:\/\/www.groningen-seaports.com\/en\/nieuws\/author\/gsp_martijn\/"},"comment_info":"","category_info":[{"term_id":52,"name":"OFFSHORE WIND","slug":"offshore-wind","term_group":0,"term_taxonomy_id":52,"taxonomy":"category","description":"","parent":0,"count":44,"filter":"raw","cat_ID":52,"category_count":44,"category_description":"","cat_name":"OFFSHORE WIND","category_nicename":"offshore-wind","category_parent":0}],"tag_info":false,"_links":{"self":[{"href":"https:\/\/www.groningen-seaports.com\/en\/wp-json\/wp\/v2\/posts\/12821","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.groningen-seaports.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.groningen-seaports.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.groningen-seaports.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.groningen-seaports.com\/en\/wp-json\/wp\/v2\/comments?post=12821"}],"version-history":[{"count":1,"href":"https:\/\/www.groningen-seaports.com\/en\/wp-json\/wp\/v2\/posts\/12821\/revisions"}],"predecessor-version":[{"id":12822,"href":"https:\/\/www.groningen-seaports.com\/en\/wp-json\/wp\/v2\/posts\/12821\/revisions\/12822"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.groningen-seaports.com\/en\/wp-json\/wp\/v2\/media\/2447"}],"wp:attachment":[{"href":"https:\/\/www.groningen-seaports.com\/en\/wp-json\/wp\/v2\/media?parent=12821"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.groningen-seaports.com\/en\/wp-json\/wp\/v2\/categories?post=12821"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.groningen-seaports.com\/en\/wp-json\/wp\/v2\/tags?post=12821"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}